Gibraltar Dam Flume

Santa Barbara, CA

Needing a more accurate method of measuring outflow from the Gibraltar Reservoir, the City of Santa Barbara chose an open channel flume.  SSG provided structural engineering design and detailing from pre-design through construction for the pipeline modifications, new building and associated components.  The new CMU building is designed and details with potential vandals in mind for this remote location.